£1.8m
Project Value
  • Purpose-built Engineering & Manufacturing T Level facility delivered
  • Modern industry-aligned training environments created for technical education
  • Fully equipped Motor Vehicle and Electric Vehicle (EV) workshops installed
  • Project delivered with support from T Level capital funding

Project Background

AEC delivered a new purpose-built Engineering & Manufacturing T Level facility, transforming the site of an ageing mechanical workshop into a modern Green Skills Hub. Acting as part of the wider project team, AEC managed the scheme from early groundwork through to completion, providing a high-quality technical learning environment to support the delivery of specialist vocational training.

The single-storey development includes a fully equipped Motor Vehicle Workshop and a dedicated Electric Vehicle (EV) Workshop, designed to support both current and emerging engineering technologies. Alongside the new build, AEC also delivered a science laboratory refurbishment within the college, creating a modern teaching space to support the delivery of T Level Health & Science courses.

Together, the projects have enhanced the college’s specialist training facilities, providing modern, industry-aligned environments that support the delivery of future-focused technical education.

Concept to Completion

The images below illustrate the journey from early design concept through construction to the completed Engineering & Manufacturing facility.

Concept Design

Architectural Concept & Feasibility

Early architectural designs established the proposed layout, building form and external appearance of the new Engineering & Manufacturing facility, providing the basis for the project's development

BDC1

Groundworks

Site Preparation & Enabling Works

Following the necessary planning and approvals, the site was prepared for construction. Existing gas and water services were capped or diverted to accommodate the new building, allowing groundworks and foundation construction to proceed.

BDC1

Structural Framework

Steel Frame Construction

The building's steel framework was erected, establishing the overall form and layout of the new facility. The frame provides the supporting structure for the roof, external cladding and subsequent internal installations.

BDC3

Internal Fit-Out

Partitions & Building Services

Internal fit-out progressed with the installation of partition walls, ventilation ductwork, cable containment and electrical services. These installations established the internal room layouts and infrastructure required for the specialist training facilities.

BDC4

Workshop Construction

Engineering & Manufacturing Training Space

Construction progressed within the main workshop, with mechanical and electrical services installed throughout the open-plan workshop. The space was prepared to house specialist engineering equipment and practical teaching activities.

BDC3

M&E Installations

Mechanical Plant & Building Services

The completed plant room incorporates mechanical equipment, insulated ductwork, pipework and associated building control systems. These installations support the building's heating, ventilation and operational requirements.

BDC6

EV Charging Infrastructure

Dedicated Electric Vehicle Charging Bays

Dedicated EV charging bays were provided alongside the new facility, incorporating marked parking spaces and charging infrastructure to support practical electric vehicle training.

BDC7

Completed Facility

Green Skills Hub & External Facilities

The completed Green Skills Hub provides a purpose-built Engineering & Manufacturing training environment, incorporating specialist workshop facilities, modern building services and dedicated EV charging bays. 

BDC2

Construction to Completion

Take a look at the completed facility, delivering modern workshops and specialist training environments for the next generation of engineers.

BDC video thumb
Trusted by over 500 clients

Speak to us about the future of your estate

Left
I'm interested in: 
Right
Consent
Agree marketing
Agree 
RICS JPG
CHAS Elite
ISO 9001 Web
ISO 45001 2018 280x160
CE Plus Web
SSIP 280x160