- £123k
- Project Value
- Multi-Use Games Area fully refurbished into a modern outdoor facility
- All-weather upgrade completed with improved drainage and slip resistance
Project Background
This project delivered the full refurbishment of an existing Multi-Use Games Area (MUGA), creating a safe, durable, and inclusive outdoor sports facility. Works included the removal of defective surface finishes, localised base repairs, and the installation of a new high-performance sports surfacing system designed for multi-sport use.
New court line markings were applied to support a wide range of activities, enhancing usability for both curriculum delivery and community sessions. The scheme also included new perimeter fencing and access gates, alongside the supply and installation of modern goal units and updated sports equipment.
The upgraded MUGA was completed with improved drainage performance and enhanced slip resistance, providing a robust all-weather sports area that will benefit students and the wider community for years to come.